NSTX U Construction Related (Title III) Analysis Issues
Authors: Peter H. Titus, L. Dudek, M. Smith, A. Brooks
Abstract: The NSTX Upgrade is currently under construction
and is scheduled to start operations early in 2016. Upgrade
designs were analyzed and qualified prior to the beginning of
construction, but many issues arose during manufacture and
assembly that required adjustments in design and analysis of
components. Some designs relied on testing that occurred after
final design when the actual material and processes were selected
by vendors or in-house shops. Design of some components, like the
bus bars was deferred until field run interferences could be
identified. Some components used materials that did not meet
original specifications. New materials or processes had to be
found and components sometimes needed requalification. Cognizant
Engineers (COG;s) and analysts worked closely to work out
resolution of issues and perform redesign and reanalysis.
Revisions to calculations were prepared and filed. Some
significant items addressed in the Title III effort are selected
for more detailed discussion.
_________________________________________________________________________________________________
Presented at: 21st Topical Meeting on Technology of Fusion
Engineering (TOFE), Anaheim, CA, November 2014
Submitted to: Fusion Science & Technology
_________________________________________________________________________________________________
Download PPPL-5126
(pdf 11.1 MB 9 pp)
_________________________________________________________________________________________________